Email

info@gmail.com

Phone

+921 345 6789

FMEA (AIAG/VDA) & Control Plan

Strengthen risk management capability

Key benefits:

  • Apply the AIAG & VDA FMEA methodology to proactively manage risk
  • Identify and prioritize failure modes using Action Priority (AP) & Risk Priority Number (RPN)
  • Reduce scrap, rework, and warranty costs through prevention focused analysis
  • Integrate FMEA into product, process, and continuous
    improvement efforts

Training Overview:

This FMEA course equips participants with the skills to identify, assess, and reduce risk using the AIAG & VDA methodology. Participants learn how to proactively prevent failures in products and processes to improve quality and reliability.

Through hands-on exercises and real-world application, participants apply the 7-step FMEA process, evaluate risk, and prioritize actions. The course emphasizes measurable impact, including reduced scrap and rework, improved product reliability, and lower warranty costs.

Training Objectives:

  • Define FMEA and its role in risk management and quality improvement
  • Explain the AIAG & VDA 7-step FMEA process
  • Perform structure, function, and failure analysis
  • Evaluate Severity, Occurrence, and Detection ratings
  • Use Action Priority (AP) to prioritize risk reduction
  • Develop preventive and detection controls
  • Identify and reduce potential failure risks
  • Quantify savings from reduced defects and warranty claims
  • Connect FMEA results to operational and financial performance
  • Integrate FMEA into continuous improvement efforts